The new site opening at the Polykon plant needed airside products that would cover an 8-hectare surface area, meet the plant’s environmental standards, and be installed and running in time for the site’s opening.

Henrico Doctor’s Hospital’s existing rooftop mounted, exposed sheet metal ductwork with board insulation was falling off and leaking.

AdvanSix was looking to renovate and add on to a more than 18,000 SF vacant building to house both R&D labs and storage, and was eager to have a single point of contact manage the project.